Avantus Signs 800 MW With PG&E, Duke Plans 300 MW in Florida

Avantus signs 800 MW solar and 3,200 MWh storage contracts with PG&E this week, alongside a new 300 MW Florida solar build plan from Duke Energy, a domestic steel-frame supply agreement, and mixed news for battery storage companies. Here is what happened between November 16 and 22, 2026, according to the sources cited.

  • Avantus signed 20-year contracts with PG&E for 800 MW of solar and 3,200 MWh of storage, pending CPUC approval.
  • Duke Energy Florida filed plans for four solar sites totaling 300 MW.
  • Thornova Solar and Nextpower agreed to use US-made steel frames in some modules.
  • Silver prices appear to have settled near $50 per ounce, adding pressure to shift to copper.
  • Storage: EQT agreed to buy Flatiron Energy, while ESS Tech ceased operations.

1. Avantus signs 800 MW solar and 3.2 GWh storage deal with PG&E

Developer Avantus signed 20-year power purchase agreements with Pacific Gas and Electric for 800 MW of solar and 3,200 MWh of battery storage, TaiyangNews reported on November 18. The contracts cover Buttonbush 1A and 1B, the first phases of the Buttonbush Solar Center in western Kern County. The estimated investment is $3 billion, with around 900 union construction jobs. Construction is scheduled to begin in 2027, with commercial operation targeted for 2029. The agreements still need approval from the California Public Utilities Commission.

Why it matters: utility-scale solar paired with large batteries is becoming the default for California’s evening demand peak, the same timing issue rooftop owners face under the state’s net billing rules.

2. Duke Energy Florida plans four new solar sites

Duke Energy Florida plans four new solar sites with a combined 300 MW in Orange and Sumter counties, according to TaiyangNews and pv magazine USA (both November 18). Duke says the projects are expected to generate an estimated $1 billion in customer savings over their operating lifetimes. The plans were filed with the Florida Public Service Commission, and operations are tentatively scheduled to begin by June 2028.

3. Thornova and Nextpower sign US steel-frame supply deal

Module maker Thornova Solar signed a master supply agreement with Nextpower at RE+ 2026 in Las Vegas to integrate Nextpower’s US-manufactured steel frames into selected Thornova module series, TaiyangNews reported. The modules target utility-scale and commercial and industrial projects, particularly in the Midwest and Southeast. Thornova says the frames can deliver “up to 125% higher allowable panel loading in tracker applications,” with improved resistance to wind uplift and glass breakage. That is a company claim, not an independent test result.

Why it matters: domestic components can help projects meet domestic content and foreign-entity sourcing rules tied to federal tax credits. Business owners can read more in our commercial solar tax credit guide.

4. Silver prices find a floor near $50 per ounce

Silver prices “appear to have established a new floor near $50 per ounce after retreating from January’s record high,” pv magazine USA reported on November 18, in an interview with Metals Focus managing director Philip Newman. The piece also discusses pressure on cell manufacturers to replace silver with copper and the possibility of renewed price increases in 2027. Silver paste is a significant cost input in solar cells, so sustained high prices can affect module costs.

5. EQT to acquire Flatiron Energy’s 24 GWh storage portfolio

Investment firm EQT agreed to acquire Flatiron Energy, pv magazine USA reported on November 20. According to the report, Flatiron has a 24 GWh battery storage portfolio across the eastern United States, with 2 GWh under construction, including a new project near Boston.

6. ESS Tech ceases operations

Iron-flow battery maker ESS Tech shut down, ceased operations and filed for bankruptcy, pv magazine USA reported on November 17, ending the company’s long-duration storage ambitions. ESS Tech focused on utility and commercial long-duration storage rather than home batteries.

Also this week

  • Tesla is seeking a Texas tax break for a $3.1 billion polysilicon plant (pv magazine USA, Nov. 19).
  • OCI Energy sold its 327 MW DC Clairemont project in Kent County, Texas, to Hyundai Engineering; construction is expected to begin in Q3 2027 (TaiyangNews, Nov. 18).

What this means for homeowners and businesses

Most of this week’s news is utility-scale, but the trends reach rooftops too: more storage paired with solar, a push toward domestic supply chains, and raw-material costs that can influence equipment prices. Note that, as of November 2026, the homeowner Section 25D tax credit has ended for systems placed in service after December 31, 2025, while commercial projects may still qualify for Section 48E under its own deadlines. For last week’s roundup, see North Carolina skips a year of solar.

Avantus Signs 800 MW With PG&E, Duke Plans 300 MW in Florida
Avantus Signs 800 MW With PG&E, Duke Plans 300 MW in Florida

Similar Posts